Structural Steel Shop Drawing Checklist: What Fabricators Need Before the Job Starts

Aug 27
3 min read

Steel fabrication cannot start without a complete, reviewed shop drawing set. Fabricators who begin cutting steel from incomplete drawings end up with material waste, field fit-up problems, and costly RFIs that delay erection schedules. This checklist covers everything that needs to be confirmed before a structural steel shop drawing set goes to the fabrication floor.

Why Shop Drawings Matter to Fabricators

Contract structural drawings show the engineer's design intent. Shop drawings translate that intent into fabrication-ready instructions: exact member dimensions, connection details, bolt patterns, weld symbols, camber requirements, and surface treatment specifications. A fabricator working from contract drawings alone is guessing at details the shop drawing is supposed to resolve.

A complete shop drawing set signed and sealed by the engineer of record is also a contractual milestone — it is typically required before the general contractor releases the fabrication purchase order.

Input Documents: What to Collect Before Detailing Begins

Before sending a scope to a detailing firm, confirm you have the following:

  • Structural steel contract drawings (plan views, elevations, sections, connection schedules) in PDF and DWG or Revit format

  • Project specifications — Division 05 structural steel section covering material grades (ASTM A992, A36, A500), bolt type (A325, A490, A563), weld process, and surface treatment

  • AISC Code of Standard Practice and RCSC Bolt specification references if applicable

  • Architectural drawings for coordination at interface conditions — facades, curtain walls, slab edges, and roof penetrations

  • MEP drawings to flag openings, hangers, and equipment support attachments

  • Geotechnical report for anchor bolt design at column bases

  • Any existing RFIs or addenda that modify the contract drawings

  • Erection sequence plan if the structural engineer has issued one

Shop Drawing Checklist: What Each Sheet Should Show

Connection Details

  • Bolted connections: bolt grade, diameter, quantity, spacing, edge distances, and hole type (standard, oversized, slotted)

  • Welded connections: weld symbol, process (SMAW, FCAW), electrode classification, and pre-heat requirements for thick plates

  • Moment connections: stiffener plates, continuity plates, doubler plates, and their welds

  • Base plates: plate dimensions, anchor bolt layout, grout clearance, and weld to column

Member Details

  • Member marks consistent with the erection drawing

  • Exact cut lengths including cope and block dimensions

  • Camber requirements for beams over the specified span threshold

  • Hole locations for field-bolted connections

  • Shop-applied surface treatment: paint system, blast profile, or hot-dip galvanizing specification

Erection Drawings

  • Piece marks keyed to the bill of materials

  • Setting dimensions for anchor bolts at each column base

  • Elevation of each finished top-of-steel (TOS) elevation

  • Sequence notes for multi-phase erection or phased occupancy projects

  • General notes covering code references, material grades, and inspection requirements

Bill of Materials

  • Complete listing of all members by mark, section, grade, length, quantity, and weight

  • Separate listing for connection material: plates, angles, gussets, anchor bolts, nuts, and washers

  • Totals by material grade for procurement

Pre-Fabrication Verification Steps

Before the drawing set goes to the fabrication floor, run through these checks:

  1. Confirm the engineer of record has reviewed and stamped the shop drawing set — fabrication without EOR approval is a liability exposure

  2. Verify all RFI responses are incorporated and clouded on the affected sheets

  3. Check that anchor bolt layouts on the shop drawings match the civil or structural foundation drawings exactly

  4. Confirm bolt grades specified on shop drawings match what is on order from the supplier

  5. Verify camber values are called out on beams over the project-specified span length

  6. Check surface treatment specs against the project's coating system — shop paint and field paint must be compatible

Working with a Detailing Partner

When outsourcing structural steel shop drawings, the checklist above is also your briefing document. A detailing firm that asks for all of these inputs at the start of a project is doing its job correctly. One that starts detailing without the complete input set will need to stop and ask — or worse, will make assumptions that cost you rework.

Shop Drawings Pro produces structural steel shop drawings using AutoCAD, Tekla, and Revit for fabricators and structural engineers across commercial, industrial, and infrastructure projects. Our detailing team includes connection details, erection drawings, and bill of materials as standard deliverables.

Request a Free Evaluation

Send us your contract drawings and project specifications and we will review your scope and return a quote within 24 hours. Contact Shop Drawings Pro at shopdrawingspro.com to get started.

 
 

Recent Posts

See All

Contact Shop Drawings Pro

Thanks for reaching out!

© 2023 by ShopDrawingsPro.com All Rights Reserved.

© Copyright ShopDrawingsPro
bottom of page